Free weeks between dates calculator: count the weeks, days and leftover days between any two calendar dates, with an exact weeks-and-days breakdown.
This calculator answers a simple question: how many weeks lie between two calendar dates? Pick a start date and an end date, and it returns the span in weeks, the same span in whole days, and a tidy weeks-and-days breakdown such as 1 week and 3 days.
The day count is an exclusive interval: you count the days you add to the start date to reach the end date. 1 January to 8 January is therefore 7 days, which is exactly 1 week, and 1 January to 1 February is 31 days. This is the same rule used by the site's date difference calculator, and it follows the ISO 8601 calendar date standard.
One week is always seven days, so the week figure is just the day count divided by seven and rounded to one decimal place. The two smaller cards then split that span into complete weeks plus the remaining days, so you can read it either way: 1.4 weeks, or 1 week and 3 days.
All arithmetic happens in UTC calendar days, matching the value a date field stores, so daylight saving changes and different time zones never shift the answer by a day. The order of the two dates does not matter either: the span is reported as a positive number whichever field is filled first.
When the page loads, both date fields start on the same rolling default of 30 days before today, so the very first result is a zero span. Replace them with the dates you care about and the cards update straight away.
The large figure is the span in weeks to one decimal place. The two smaller cards split it into complete weeks and the leftover days, so 10 days reads as 1 week and 3 days.
Count the whole days from the start date to the end date, then divide by seven. For example, 1 January to 1 February is 31 days, and 31 / 7 = 4.4 weeks. The cards also show 31 days as 4 complete weeks plus 3 remaining days.
No. The count is exclusive: it is the number of days you add to the start date to land on the end date. Monday to the following Monday is 7 days, or 1 week, rather than 8 days.
Both fields are seeded with the same rolling default, 30 days before today, so the page always offers a valid pair of dates. That first result is a zero span; choose your own two dates and the weeks, days and breakdown update immediately.