Free SMV calculator for garment time studies. Calculate rated standard minutes with allowances for each sewing operation and total the garment SMV.
Standard Minute Value (SMV) estimates the allowed time for a defined garment operation at standard pace, including the allowance used by the factory. Production engineers use it to compare operation work content and total the standard time for a garment.
Enter the average observed cycle time for each operation, choose seconds or minutes, and enter its performance rating and allowance. Add or remove rows to match the operation breakdown for the garment.
This tool applies the allowance as a percentage of rated basic time. SMV methods and allowance policies can vary between factories and customers, so confirm the convention required for your study.
Sample time study: three operations at 30, 45 and 60 seconds, each rated at 100% with a 15% allowance.
Up to 100 operations. Time must be greater than 0 and no more than 1,000,000; rating must be 1–300%; allowance must be 0–100%.
| Operation name | Observed time (minutes) | Basic time (minutes) | Allowance time (minutes) | Operation SMV (minutes) |
|---|---|---|---|---|
| Seam stitching | 0.5 | 0.5 | 0.075 | 0.575 |
| Attach sleeve | 0.75 | 0.75 | 0.1125 | 0.8625 |
| Hem finish | 1 | 1 | 0.15 | 1.15 |
| Total garment SMV | 2.25 | 2.25 | 0.3375 | 2.5875 |
SMV means Standard Minute Value: the allowed standard time for one operation or product under a defined method and pace, including the selected allowances. In apparel work it is used for line planning, capacity and costing.
Convert observed cycle time to minutes, multiply by the performance rating divided by 100, then multiply by 1 plus the allowance percentage divided by 100. Add operation SMVs to estimate the garment total.
The rating adjusts observed time to the agreed standard pace. For example, 120% means the observed operator worked 20% faster than the 100% reference pace, so rated basic time increases by a factor of 1.20.
Allowance covers the factory's defined personal, fatigue and unavoidable-delay time. It is entered as a percentage of basic time here; use the convention and allowance policy required by your factory or customer.
Yes. Add one row for each operation, enter its average cycle time, rating and allowance, then use the total SMV as the sum of the operation SMVs. Remove operations that are not part of the garment.